Projects - Current and Past

  • 2025 - Present

    Uungula Wind Farm (Wellington NSW)

    Nacap

    Survey Control Network

    Setout for Structures

    Road formations

    Final As-built Data and Plans

  • 2024 - Present

    Hume Link East (Southern Tablelands)

    Acciona

    Providing surveying services for the early works package

  • 2024 - Present

    Singleton Bypass (NSW)

    Acciona

    Bridge Modelling

    Setout for Bridges and Structures

    Final As-built Data and Plans

  • 2024 - Present

    Surveying Services Supplier

    Armidale Regional Council

    Preferred supplier for surveying services at Armidale Regional Council

  • 2024 - Present

    Inland Rail - Narwona Material Distribution Centre

    Martinus

    Survey Control Network

    Rail realignment and new rail loop

    Road and Rail formations

    Setout for Structures

    Final As-built Data and Plans

  • 2024 - Present

    Inland Rail - Albury to Parkes

    Martinus

    Survey Management

    Data Validation and Quality Assurance

  • 2023 - Present

    Surveying Services Supplier

    MidCoast Council

    Preferred supplier for surveying services at MidCoast Council

  • 2023 - Present

    Fixing Country Bridges Program (Port Macquarie NSW)

    Saunders Civilbuild

    Survey Control Network

    Setout for Bridges

    Final As-built Data and Plans

  • 2023 - Present

    Sydney Metro - Western Sydney Airport (Penrith and Thornton NSW)

    CPB Contractors

    Surface and Civil Alignment Works

    Survey Control Network

    Setout for Bridges

    Castyard works for Bridge Superstructures

    Final As-built Data and Plans

  • 2023-Present

    Ocean Drive Duplication (Port Macquarie, NSW)

    Ditchfield Contracting

    Civil Earthworks setout and conformance

    Setout for structures

  • 2022 - Present

    Parkes Bypass Bridges (Parkes NSW)

    Georgiou

    Survey Control Network

    Setout for Bridges

    Rail Setout and Ongoing Monitoring

    Final As-built Data and Plans

  • 2022-2023

    Taree Railway Station Upgrade (Taree NSW)

    Abi Civil Contracting

    Survey Control Network

    Civil Realignment Works

    Setout for Structures

    Final As-built Data and Plans

  • 2022-2023

    New England Solar Farm (Uralla, NSW)

    Green Light Contractors (GLC - Elecnor)

    Setout for Structures

    Formation and Earthworks Design

    Reporting and Data Management

    Final As built Data and Plans

  • 2021-2022

    Inland Rail (Narrabri to North Star NSW)

    Trans4m Rail

    Survey Management of Staff

    Formation and Earthworks Design

    Machine Control Modelling

    BIM Modelling, Reporting and Data Management

  • 2020-2022

    Muswellbrook Bridge Replacements (NSW)

    Laing O’Rourke / ARTC

    Survey Control Network

    Setout for Structures

    Incremental Launch Bridge Construction

    Formation and Earthworks Design

    Reporting and Data Management

    Rail Setout and Ongoing Monitoring

    UAV Mapping and Volumes

    Final Asbuilt Data and Plans

  • 2018-2020

    Woolgoolga to Ballina Pacific Highway Upgrade (NSW)

    BMD Constructions

    Slip Form Concrete Paving

    Setout for Pavements

    Reporting and Data Management.

    Ellerton Drive Extension (Queanbeyan NSW)

    WBHO / Roads and Maritime Services NSW

    Survey Control Network

    Earthworks and Drainage Construction

    Machine Control

  • 2017

    Canberra Metro Construction (ACT)

    CPB / John Holland JV

    Slip-formed track slab construction

    Rail Installation

    Conformance Reporting

  • 2015 - 2016

    Newcastle Light Rail (NSW)

    Transport for NSW

    Survey Control Network

    Survey detail to MX Standard

  • 2015

    Kundabung to Kempsey Pacific Highway Upgrade (NSW)

    McConnell Dowell OHL JV

    Pavement Surveys

    Survey Manager

    Quantity Calculations

  • 2012

    Frederickton to Eungai Pacific Highway Upgrade (NSW)

    Thiess

    Survey Manager

    Site establishment and data management

    Remote Machine Control Connectivity

  • 2010

    Hunter Expressway

    Thiess / RMS Alliance

    Survey Control Network

    Earthworks and Structures

    Pavement Construction

    Machine Controlled Slip-form Paving